Pinaka Green delivers HAZID, HAZOP, SIL, LOPA, QRA and the full suite of process-safety studies for hydrogen, oil & gas and chemical facilities. We chair the studies, write the reports and close the actions. And we are building PinakaPro, the platform we run them on.
PinakaPro platform · in beta, built with early partners| Deviation | Cause | Consequence | Safeguards | Risk | Action |
|---|---|---|---|---|---|
| High pressure | Gas-outlet PCV-101 fails closed; flare KO drum back-pressure | Overpressure of V-101; loss of containment, jet fire | PSV-101 to flare, PAHH-101 → ESD closes inlet SDV-100 | H · 4C | A-0207 · LOPA |
| High level (oil) | LCV-102 fails closed; export pump trip | Oil carry-over to gas outlet → compressor K-201 damage | LAHH-102 trip, demister pad | M · 3C | A-0208 |
| Low level (water) | Interface LT-103 drift; LCV-103 fails open | Gas blow-by to produced-water system; vessel overpressure downstream | LALL-103 trip on water outlet, downstream PSV | M · 3B | A-0209 |
Delivered by chartered engineers with operating-plant experience. We work directly for owners and operators, and as a sub-contracted study team for EPCs, licensors and consultancies that need the capacity or the hydrogen expertise.
HAZOP is the floor, not the ceiling. It tells you what can go wrong; it cannot size a safeguard, quantify residual risk or prove the risk is ALARP. The studies below are how that gets done, and in what order.


Deviation: HIGH PRESSURE on V-101. Cause: gas-outlet PCV fails closed. Consequence: loss of containment, jet fire. HAZOP flags the scenario but cannot say whether the safeguards are enough.
Tolerable frequency 1×10⁻⁵ /yr. Initiating event 1×10⁻¹ /yr. PSV credited at PFD 10⁻² gives 1×10⁻³ /yr. Still 100× short of tolerable.
Closing a 100× gap needs an independent trip with RRF ≥ 100, so PFD ≤ 10⁻²: a SIL 2 PSHH → SDV loop. Verify the design achieves it; validate before startup.
Safety, operations and maintenance own the same barriers. A safeguard the HAZOP credits is only real if operations run it inside its limits and maintenance proves it on schedule.
Process safety is driven top-down. Plants with award-winning personal-safety records have still suffered catastrophic process-safety failures, because the two are different disciplines with different leadership.
Log every risk across people, financial and reputation. Score each on impact × likelihood on a 1 to 25 scale. Tackle the high-score reds first, and keep the register live.
We audit and build to the 20-element PSM framework used by IChemE and the Energy Institute, grouped under four commitments:
We scope, chair, scribe, report and track actions to closure. On site or remote, in English or Hindi, with your risk matrix or ours.
Plug our facilitators and engineers into your project under your name. We work to your templates and deliverable formats, and keep your client relationship yours.
Standard HAZOP, SIL and HAC packages for electrolysers, compressors and storage, reused across your fleet so every delivery starts from the last one.
Every study we deliver teaches the product something. PinakaPro is in beta with a small group of early partners. It is one system of record for the whole study lifecycle, and it will grow from Safety into Projects and O&M.
Worksheets get copied, renamed and emailed. Six months later nobody can say which version the auditor saw, or whether a safeguard was ever installed.
Risk ranks from the HAZOP never flow into the LOPA, and the SIL determination is redone from scratch by a different consultant with different assumptions.
Recommendations live in a PDF appendix. Ownership is unclear, due dates slip, and management of change is handled by memory.
Facilitate, record and close every process-safety study.
Project management framework for EPC and owner's-engineer teams.
Keep barriers healthy after handover.
IEC 61882 guidewords and parameter matrices per node. Worksheet, risk matrix and action log update together.
Pull any HAZOP scenario into a LOPA. IEF, IPL credits and conditional modifiers from a maintained library; TMEL and RRF computed.
Risk-graph and LOPA routes to IEC 61511. Target SIL, PFDavg and proof-test interval recorded per SIF.
Threats, barriers and consequences drawn from the same scenarios, so the bowtie never contradicts the HAZOP.
Every recommendation has an owner, a due date and evidence of closure. Overdue actions are visible to the plant manager.
Safety-critical elements traced from the bow-tie to their performance standards, with assurance tasks and barrier health in one view.
Deviation sets, material-compatibility prompts and ignition-energy data for electrolysis, compression, storage and refuelling.
Versioned report with revision history, attendance, node drawings and the full action register. PDF and DOCX.
PinakaPro is the process-safety practice and product of Pinaka Green, alongside its hydrogen project development and advisory work. The same engineers deliver the studies and shape the software.
Deepak Farmania, Founder & CEO. 19 years across BG Group, Shell and QatarEnergy. IIT Bombay Chemical Engineering, CEng MIChemE.
Chartered process and safety engineers with upstream, LNG, refining and electrolysis experience. Facilitators certified in HAZOP leadership and functional safety.
Working with engineering consultancies in India and the Gulf for oil & gas O&M and safety studies. Partner enquiries welcome.
Gurugram, India. Delivering across India, Oman and the wider GCC, on site and remote.
Tell us what you are running and when. We reply within one working day with a scope, a team and a date. If you would like early access to the PinakaPro beta, say so and we will add you to the partner group.