Process safety engineering · India & GCC · Building for the world

Process safety, engineered.

Pinaka Green delivers HAZID, HAZOP, SIL, LOPA, QRA and the full suite of process-safety studies for hydrogen, oil & gas and chemical facilities. We chair the studies, write the reports and close the actions. And we are building PinakaPro, the platform we run them on.

PinakaPro platform · in beta, built with early partners
HAZOP · Node 02 · HP three-phase separator V-101 (gas / oil / produced water)PINAKAPRO · BETA
DeviationCauseConsequenceSafeguardsRiskAction
High pressureGas-outlet PCV-101 fails closed; flare KO drum back-pressureOverpressure of V-101; loss of containment, jet firePSV-101 to flare, PAHH-101 → ESD closes inlet SDV-100H · 4CA-0207 · LOPA
High level (oil)LCV-102 fails closed; export pump tripOil carry-over to gas outlet → compressor K-201 damageLAHH-102 trip, demister padM · 3CA-0208
Low level (water)Interface LT-103 drift; LCV-103 fails openGas blow-by to produced-water system; vessel overpressure downstreamLALL-103 trip on water outlet, downstream PSVM · 3BA-0209
Open actions 3LOPA pending 1 (TMEL 1×10⁻⁵ /yr)SIL target SIL 2 · PSHH → SDV
Services

Every study a facility needs, from concept through operation

Delivered by chartered engineers with operating-plant experience. We work directly for owners and operators, and as a sub-contracted study team for EPCs, licensors and consultancies that need the capacity or the hydrogen expertise.

Hazard identification

  • HAZID and ENVID
  • HAZOP (new, revalidation, MoC)
  • What-if / checklist reviews
  • FMEA / FMECA
  • SIMOPS and constructability reviews
IEC 61882 · ISO 17776

Functional safety

  • LOPA
  • SIL classification (risk graph, LOPA)
  • SIL verification and PFD calculation
  • Safety requirement specifications (SRS)
  • Proof-test philosophy
IEC 61511 · IEC 61508

Consequence & risk

  • Fire & explosion risk assessment (FERA)
  • Quantitative risk assessment (QRA)
  • Occupied building risk assessment (OBRA)
  • Escape, evacuation and rescue (EERA)
  • Emergency systems survivability (ESSA)
  • Dispersion and radiation modelling
API 752/753 · CCPS guidelines

Barrier management

  • Major accident hazard (MAH) bow-tie analysis
  • Safety-critical element (SCE) identification
  • Performance standards (PS) for SCEs
  • SCE assurance and verification schemes
  • Barrier model and barrier health reporting
ISO 17776 · EI / IChemE guidance

Operations & assurance

  • Safety case and ALARP demonstration
  • Pre-startup safety review (PSSR)
  • Alarm management (rationalisation, KPIs)
  • PSM audits and gap assessments (20-element)
  • Root cause analysis (RCA) and incident investigation
  • HAZOP and QRA revalidation (5-yearly)
OSHA PSM · OISD · EEMUA 191

Hydrogen specialisation

  • Electrolyser and BoP HAZOP
  • H₂ compression, storage and refuelling studies
  • H₂-in-O₂ and O₂-in-H₂ safeguarding
  • PESO / CCE licensing support
  • Green ammonia and methanol integration
ISO 22734 · ISO 19880 · NFPA 2
Green hydrogenRefining & petrochemicalsOil & gas upstreamFertiliser & ammoniaSpeciality chemicalsPower & utilitiesPharma API
The full toolkit

About 20 studies, five families, one continuous thread across the asset lifecycle

HAZOP is the floor, not the ceiling. It tells you what can go wrong; it cannot size a safeguard, quantify residual risk or prove the risk is ALARP. The studies below are how that gets done, and in what order.

Table of process-safety studies by lifecycle phase: feasibility, DPR/FEED, execute, startup and operate, grouped into identify hazards, quantify risk, engineer safeguards, manage barriers, and assure and operate
Study programme by lifecycle phase. Revalidation of HAZOP, HAC, QRA and the safety case every five years; SIF proof testing every three to five.
Flow diagram showing how HAZID feeds HAZOP, HAC and FERA; HAZOP feeds LOPA, FMEA, bow-tie and alarm management; LOPA leads through SIL assessment, verification and validation; FERA leads through QRA, OBRA, EERA and ESSA; all converge on the safety case and ALARP demonstration under PSM
How the studies interconnect. Every arrow is a hand-off we manage, so the LOPA uses the HAZOP scenario and the safety case cites the SIL validation.
1 · HAZOP

What can go wrong

Deviation: HIGH PRESSURE on V-101. Cause: gas-outlet PCV fails closed. Consequence: loss of containment, jet fire. HAZOP flags the scenario but cannot say whether the safeguards are enough.

2 · LOPA

Is the protection enough?

Tolerable frequency 1×10⁻⁵ /yr. Initiating event 1×10⁻¹ /yr. PSV credited at PFD 10⁻² gives 1×10⁻³ /yr. Still 100× short of tolerable.

3 · SIL

Engineer and prove the safeguard

Closing a 100× gap needs an independent trip with RRF ≥ 100, so PFD ≤ 10⁻²: a SIL 2 PSHH → SDV loop. Verify the design achieves it; validate before startup.

Beyond the studies

Studies find the hazards. A management system keeps the barriers alive.

Asset integrity is three disciplines in one room

Safety, operations and maintenance own the same barriers. A safeguard the HAZOP credits is only real if operations run it inside its limits and maintenance proves it on schedule.

Leadership is the core

Process safety is driven top-down. Plants with award-winning personal-safety records have still suffered catastrophic process-safety failures, because the two are different disciplines with different leadership.

Rank, then go after the reds

Log every risk across people, financial and reputation. Score each on impact × likelihood on a 1 to 25 scale. Tackle the high-score reds first, and keep the register live.

We audit and build to the 20-element PSM framework used by IChemE and the Energy Institute, grouped under four commitments:

Commit to process safety

  • Process safety culture
  • Compliance with standards
  • Process safety competency
  • Workforce involvement
  • Stakeholder outreach

Understand hazards and risks

  • Process knowledge management
  • Hazard identification and risk analysis

Manage risk

  • Operating procedures
  • Safe work practices
  • Asset integrity and reliability
  • Contractor management
  • Training and performance assurance
  • Management of change
  • Operational readiness
  • Conduct of operations
  • Emergency management

Learn from experience

  • Incident investigation
  • Measurement and metrics
  • Auditing
  • Management review and continuous improvement
How we work

Three ways to engage us

Owner / operator

Full study delivery

We scope, chair, scribe, report and track actions to closure. On site or remote, in English or Hindi, with your risk matrix or ours.

EPC / consultancy

Sub-contracted study team

Plug our facilitators and engineers into your project under your name. We work to your templates and deliverable formats, and keep your client relationship yours.

Licensor / OEM

Technology-specific packages

Standard HAZOP, SIL and HAC packages for electrolysers, compressors and storage, reused across your fleet so every delivery starts from the last one.

The platform · beta

PinakaPro: the tool we are building because we needed it in the room

Every study we deliver teaches the product something. PinakaPro is in beta with a small group of early partners. It is one system of record for the whole study lifecycle, and it will grow from Safety into Projects and O&M.

01

HAZOPs die in spreadsheets

Worksheets get copied, renamed and emailed. Six months later nobody can say which version the auditor saw, or whether a safeguard was ever installed.

02

LOPA and SIL happen somewhere else

Risk ranks from the HAZOP never flow into the LOPA, and the SIL determination is redone from scratch by a different consultant with different assumptions.

03

Actions never close

Recommendations live in a PDF appendix. Ownership is unclear, due dates slip, and management of change is handled by memory.

In beta

PinakaPro Safety

Facilitate, record and close every process-safety study.

  • HAZID, HAZOP, What-if, FMEA
  • LOPA and SIL determination
  • Bowtie and barrier management
  • SCE and performance standards
  • Action tracking and MoC
Planned

PinakaPro Projects

Project management framework for EPC and owner's-engineer teams.

  • Engineering deliverables list (EDML)
  • Stage gates and readiness reviews
  • Vendor document control
  • Pre-startup safety review (PSSR)
Roadmap

PinakaPro O&M

Keep barriers healthy after handover.

  • Safety-critical element tracking
  • Proof-test scheduling and SIL verification
  • Permit-to-work integration
  • Incident and RCA workflow
PinakaPro Safety · beta

What the beta already does

Guideword HAZOP

IEC 61882 guidewords and parameter matrices per node. Worksheet, risk matrix and action log update together.

Integrated LOPA

Pull any HAZOP scenario into a LOPA. IEF, IPL credits and conditional modifiers from a maintained library; TMEL and RRF computed.

SIL determination

Risk-graph and LOPA routes to IEC 61511. Target SIL, PFDavg and proof-test interval recorded per SIF.

Bowtie

Threats, barriers and consequences drawn from the same scenarios, so the bowtie never contradicts the HAZOP.

Action tracking

Every recommendation has an owner, a due date and evidence of closure. Overdue actions are visible to the plant manager.

SCE & performance standards

Safety-critical elements traced from the bow-tie to their performance standards, with assurance tasks and barrier health in one view.

Hydrogen-ready

Deviation sets, material-compatibility prompts and ignition-energy data for electrolysis, compression, storage and refuelling.

Audit-ready reports

Versioned report with revision history, attendance, node drawings and the full action register. PDF and DOCX.

Who we are

Practitioners first. We have chaired these studies on operating plants.

PinakaPro is the process-safety practice and product of Pinaka Green, alongside its hydrogen project development and advisory work. The same engineers deliver the studies and shape the software.

Founder

Deepak Farmania, Founder & CEO. 19 years across BG Group, Shell and QatarEnergy. IIT Bombay Chemical Engineering, CEng MIChemE.

Team

Chartered process and safety engineers with upstream, LNG, refining and electrolysis experience. Facilitators certified in HAZOP leadership and functional safety.

Partners

Working with engineering consultancies in India and the Gulf for oil & gas O&M and safety studies. Partner enquiries welcome.

Base

Gurugram, India. Delivering across India, Oman and the wider GCC, on site and remote.

Let's connect

Have a study coming up, or capacity to fill?

Tell us what you are running and when. We reply within one working day with a scope, a team and a date. If you would like early access to the PinakaPro beta, say so and we will add you to the partner group.

hello@pinakapro.com